October 21, 2021 | Shelby, NC
The American Restoration mitigation team responded to the call about a water fountain leak, and met with the church pastor on site. The pastor walked our team through the affected areas, and our crew began the work. First they removed baseboards in the hallway and adjacent rooms. Fans were put ...
January 14, 2021 | Charlotte, NC
The American Restoration team worked around this company's schedule to minimize the amount of time they would need to be closed. Our crews applied EPA-approved disinfectant to all surfaces within the building, and made sure to give everything a thorough cleaning - both high-touch and low-touch points throughout the facility.&...
January 15, 2020 | Shelby, NC
Project Managers immediately dispatched six mitigation technicians with two water extraction trucks to begin work for the client. After the situation was assessed, the technicians divided into separate crews. One crew began inside the least-affected business, as it had customer appointments starting that morning, while another began extracting water and ...
July 20, 2019 | Lincolnton, NC
Our Temporary Tarping Crew responded moments after the call came in, knowing that every second matters in a situation like this. Once on site, with the affected area identified and debris out of the way, our team covered the damaged section of the roof with a specialized reinforced plastic sheeting ...
July 12, 2019 | Gastonia, NC
When our Project Manager arrived on site, he noted approximately 3-4 inches of standing water in the highest areas in the crawlspace. Sewage was found throughout, and needed immediate attention. Mitigation technicians were dispatched to the job site, where they began to extract and dry the area. Once ready, our ...
June 30, 2019 | Shelby, NC
Our team arrived onsite to to meet the homeowners and scope the job. They began by removing flooring and pulling appliances away from the walls to determine the extent of the water damage. A barrier was set up to contain the work area and a de-humidifier put in place to ...
June 28, 2019 | Shelby, NC
A project manager was dispatched to scope the job site and confirm the cause of the water loss. Once this was determined, proper mitigation work began. First, contents were moved out of the basement so that all standing water could be extracted. Baseboards and shoe moldings were removed and equipment ...
June 28, 2019 | Lincolnton, NC
After our Project Manager scoped the classroom and the estimate was approved, American Restoration sent a team of three highly skilled employees equipped with the best tools for the job. This team made sure all surfaces were scrubbed free of dust and grime, and sanitized the room as an added ...
April 21, 2019 | Belmont, NC
Our crew arrived quickly to inventory the items in the garage, take photographs of the scene, and share the plan of action with the homeowner. Several priority items were brought back to our warehouse to be cleaned and restored. Though several items were heavily smoked damaged, our team worked hard ...
April 16, 2019 | Sherrills Ford, NC
After we received the call for the job, our team headed out to Sherrills Ford with the necessary supplies to secure the detached garage. As soon as the tree was removed from the structure, the crew was ready to begin. They pulled away damaged boards and metal sheeting, and carefully ...
April 2, 2019 | Salisbury, NC
Our containment system has a sound attenuating foam core which reduces renovation noise by up to 50%. It exceeds the requirements of ICRA Class IV, and the panels have been tested and are listed for ASTM E-84 Class A performance for fire and smoke. The real wall appearance of the system ...
February 28, 2019 | Spindale, NC
Once our crew arrived on site, the Project Manager inspected the area. Then he and his team immediately began the water extraction process. After all standing water was removed, our team placed blocks underneath the homeowner's storage tubs and undamaged items, making sure there were no spots where moisture could ...
September 4, 2018 | Kings Mountain, NC
After our mitigation crew handled the drying process—which also included the removal of wet and damaged flooring, drywall, and insulation—our reconstruction team, led by Jeff Wilson, began the repairs. The ceramic tile in the kitchen was matched and replaced, and matching hardwood was brought in for the repairs ...
June 20, 2018 | Shelby, NC
Our team responded after-hours to this emergency call, and came ready to work. They used mitigation trucks to extract standing water, and set up fans and dehumidifiers to run overnight to remove remaining moisture throughout the building. The crew periodically checked the moisture levels with specialized meters, and once the ...